C
106 days ago

Free red velvet couch

Chris from Hataitai

LIKELY TAKEN - WILL CONFIRM WHEN PICKED UP: Lovely and luxurious velvet couch. Two seater. Well made. Quite heavy. Free to a good home. Space needed for new "home office". Has not been used in 2020 (santised hands before moving). Contactless pickup. Will need two people to pickup. Easy access (no stairs). Hataitai. Message for mobile and address.

Free

Image
More messages from your neighbours
4 hours ago

Holiday in NZ

EECA

Need a break? Live more with less energy. Explore our NZ paradise, and enjoy a low-carbon holiday. Find out more

Image
5 days ago

Garage Sale

Joanne from Island Bay

Come and grab a bargain before it all goes to the op shop. Sheet sets, fleece blankets, oil heaters, kitchen items, camping table, camp stretchers, tent, gazebo, camp chairs, set of instruments for X box rock band, large camp oven, fire surrounds, printers, tools etc. Saturday 4th July from 9.30 to 12.30 at 21 Witham St, Island Bay.

14 hours ago

Mt Albert Tunnel Entry

The Team from Wellington Water

The final stage of the repair to the Mt Albert tunnel and sludge lines involves repairing the floor of the tunnel. As part of this, on Thursday night a crew will be entering the tunnel to perform a visual inspection.

As the tunnel is an active wastewater pipe, we’ll hold wastewater flows at the pump station while the inspection is carried out. We’re scheduling the entry at night when wastewater flows are at a minimum, thereby maximising the amount of time our crews can spend in the tunnel. The plan is for the crew to spend 40 minutes in the tunnel, while based on normal operations we have capacity at the pump station to hold the wastewater flows for up to an hour. In the very unlikely event that the crew has to spend more than an hour in the tunnel, some screened wastewater may need to be discharged from the pump station into the Cook Strait. All possible steps will be taken to prevent this, however it is important to note that this inbound wastewater is made up of 99% water, and is therefore very different to the dewatered sludge that was transported during the earlier stage of repairs. Generators onsite may create some noise, however there will be no construction undertaken during this entry. We will monitor odour and use misters if necessary.